In the S-7 IV building most of the facades units were the Hybrid type. Also, a single prefabricated façade system was used in this building. In addition, new types of new structural glazing elements with glued glass were introduced. KGCG project team implemented composite slabs to cover the bottom of the bridge. The total area of the facade reaches 6574 m2.
Related links:
https://galio.lt/lt/verslui/s7-iv-etapas/
https://mitnija.lt/project/s7-verslo-centro-4-etapas-danske-bank-globaliu-paslaugu-centras/
https://citify.eu/saltoniskiu-7-s7-4-etapas/
https://www.fotoakimirkos.lt/s7-verslo-centras
https://mitnija.lt/news/mitnija-keturiais-menesiais-anksciau-laiko-baige-galio-group-verslo-centro-s7-statyba/
https://www.vz.lt/nekilnojamasis-turtas-statyba/2021/01/09/galio-group-vilniaus-zveryne-baige-100-mln-eur-vertes-statybas